New home in Quebec: what the Garantie de construction résidentielle (GCR) covers

Buying a new house, a condo or a unit in a plex is a big project. It is also a major investment, and it is perfectly normal to want to know what happens if something does not go as planned. Good news: in Quebec, most new residential buildings are covered by a mandatory guarantee plan. Here is what you need to know before signing, then during and after construction.

What is the guarantee plan for new residential buildings?

The guarantee plan stems from the Regulation respecting the guarantee plan for new residential buildings. In practice, it protects the buyer when the contractor fails to meet some of its obligations, whether before or after the property is delivered.

Across Quebec, this plan is administered by the Garantie de construction résidentielle (GCR), a non-profit organization. Any business that builds or sells a new residential building covered by the regulation must be accredited with GCR.

Which buildings are covered?

The guarantee plan applies to the following new residential buildings:

  • detached, semi-detached or row single-family houses;
  • multi-family buildings with two to five units, from duplex to quintuplex, that are not held in divided co-ownership;
  • condos located in a building with no more than four superimposed private portions.

Condominium buildings with more than four superimposed units are not covered by this plan. If you buy in this type of building, take the time to read your contract carefully to understand the protections that apply. For details, see the GCR page on buildings covered by the guarantee.

What the guarantee covers, step by step

Before acceptance: protecting your deposits

If the contractor defaults before the building is accepted, the guarantee provides for the reimbursement of deposits paid, up to $50,000, or, under certain conditions, the completion of the work. Relocation, moving and storage costs may also be covered, up to $6,000, upon presentation of supporting documents.

At acceptance: completion and apparent poor workmanship

Work that remains to be completed and apparent poor workmanship must be reported in writing when the building is accepted. Anything not noted at this stage becomes much harder to have corrected. That is why the pre-acceptance inspection, which we discuss below, is so important.

After acceptance: the deadlines to remember

Once the property is accepted, the guarantee continues to protect you for several years, depending on the type of problem:

  • 1 year : repair of poor workmanship that existed at acceptance but was not apparent;
  • 3 years after acceptance: repair of latent defects;
  • 5 years after the end of the work: repair of design, construction or execution defects, as well as soil defects.

In all cases, the problem must be reported in writing to the contractor and to GCR within a reasonable time after it is discovered. Under certain conditions, the guarantee can also cover relocation costs during the corrective work and the restoration of the building once the repairs are done.

Coverage limits

After acceptance, coverage is limited to the amount set in the contract, up to $300,000 for a detached, semi-detached or row single-family house that is not held in co-ownership. For a multi-family building from duplex to quintuplex, the limit is $200,000 per unit. Separate limits apply to condominium units. All amounts are shown on the GCR page summarizing the protections that apply.

The pre-acceptance inspection: a step not to rush

Before acceptance, each house or unit is inspected jointly by the buyer and the contractor, using a GCR form that contains a list of items to check. This is the time to confirm that all the work set out in the contract has been done.

Take your time. Open the doors and windows, examine the finishes, floors, cabinets and equipment. Note each item to correct or complete. For this work, you agree with the contractor on a completion deadline that cannot exceed six months.

Before signing, make sure everything that needs to be corrected is written on the form. Since most buyers are not construction experts, it can be wise to be accompanied by a building professional, such as an inspector, technologist, architect or engineer. GCR explains how this step works on its page dedicated to the pre-acceptance inspection.

Our practical tips for buying with confidence

Check the contractor’s RBQ licence

The Régie du bâtiment du Québec (RBQ) licence holder register lets you confirm that a contractor holds a valid licence. It shows, among other things, the licence subclasses and any pending or paid claims. The search is free from the RBQ page Check a contractor’s licence .

Check the directory of accredited businesses

The GCR directory of accredited businesses shows the business’s accreditation status, its RBQ licence number, non-compliances found during inspections, claims and, where applicable, arbitration decisions. It is a quick check that is worth doing before signing a contract.

Keep all your documents

Preliminary contract, deed of sale, plans, pre-acceptance inspection form, deposit receipts, written exchanges with the contractor: keep everything in one place, on paper or digitally. These documents will be invaluable if you ever need to file a claim.

Report in writing, without delay

As soon as you notice a problem, notify the contractor in writing and send a copy of this notice to GCR. A phone call or a conversation on the site is not enough. Note the date of discovery, take photos and keep a copy of everything you send. The guarantee requires notice within a reasonable time, so it is best to act quickly.

This article is provided for information only. For a specific situation, refer directly to GCR or a qualified professional.

Questions about your purchase?

Buying a new property often raises many questions, and that is normal. Our team will be happy to answer them. Feel free to book an appointment with us or to discover our projects.

Read next

Clear Filters

First new home: FHSA and HBP to finance your down payment

The FHSA and the HBP can help you save the down payment for your first new home. Limits, conditions, repayment and combining the two: here is what you need to know.

GST and QST rebates for a new home in Quebec: what to know in 2026

GST, QST and the new federal rebate for first-time buyers: who is eligible, what the price thresholds and maximum amounts are, and how the builder can credit the rebate against the purchase price.